W1WQM Radio Room

16 March 2006

Construction Update March 16,2006

Success this past Saturday, March 11 as the tower crew put up the Diamond 2 M antenna at the top of the mast followed by the TH-7DXX tribander and Tailtwister rotor. Ran coax to both and checked them on the ground. All good, low SWR's so these two are all set. Need to run the 8 wire rotor cable and wire up the twist lock plug to connect to the rotor.

Continue reading "Construction Update March 16,2006" »